PROJECT PROPERTIES
• Approved laboratory control at each stage of the construction
• Soil investigation report that are issued in accordance with current earthquake regulations.
• Botanical and Constructional landscaping productions
• 1 Basketball court and 2 tennis courts
• Covered Swimming Pool, Fitness, Steam Room, Sauna
• Bcycle and walking-tracks
• Playgrounds, recreational areas
• Vehicle lane and pedestrian ways
• 80% Green-fields
• Planned landscaping and automatic sprinkler system
• In the specified number of elevators in blocks
• Open and Closed Parkings throught the project
• Accessing to the floors from parking through elevators
• Jacketing heat insulation
• Generator system that can supply 100% redundant power in all common spaces
• Environmental luminance throughout the site
• Centralised satellite tv ( SMATV ) broadcast system
• Digital addressed fire detection and warning system in compliance with the relavant regulation
• Emergency announcement sound system in the blocks and parkings that are specified in its project
• Intercom system in colour image • Security access controlled entry system at site gate
• 7/24 monitoring and environmental security system(CCTV) with recording feature closed circuit throughout the site
• Environmental luminance throughout the site
• Sprinkler fire extinction system at closed parkings
• Exhaust ventilation system at closed parkings
• Sprinkler, smoke exhaust, pressurization system at high rised blocks Bağımsız bölümlerde ısı ve ses yalıtımı
• Central heating and hot water production heat station (sup-station) system
• Solar panels at roofs in order to reduce the energy costs of common spaces
• Charging units for electric cars at closed parkings in the specified number of the project
• Steel door at flat entry
• Interior door from PVC at flat entry
• Ceramic tile on the entrance and hallway floors
• Laminated flooring on living room and other room surfaces
• Oven+Kitchen Stove+Ventilation Hood (should be emphasized separately) in the kitchens
• Gas dedector in kitchens, fire extinction and warning systems at floor lobbies
• Ventilation aspirator at bathrooms and wc
• Suspended roof, water isolation and bathroom cupboard in the bathrooms
• Water areas in 3.300 m² (decorative pools)
• Sandpit in 654 m²’
• Aquarium in 100 m²’lik
• Recycling treatment system
• Central Cafe Besides; Indoor sports hall, with 24 clasrooms elementary and secondary education school including kindergarten and conference room .
Ispartakule Emlak Residences in total area of 448.726,00 m2 that are designed in the direction of this criteria are comprised from 20 pieces 1+1, 694 pieces 2+1, 1025 pieces 3+1, 110 pieces 4+1 so in total 1849 residences, 33 commercial units and 1 piece of 24 clasrooms elementary and secondary education schools.
Sıra | Ada | Parsel | Blok | Net M2 | Fiyat | Detay |
---|---|---|---|---|---|---|
1 | 616 | 15 | MEYDAN KAFE | 227,85 | 2.983.000 | Detay |
2 | 622 | 1 | TİCARET-1 | 685,98 | 7.570.000 | Detay |
3 | 622 | 1 | K.YÜZME HAVUZ | 919,95 | 6.721.000,00 | Detay |